KitLog pro

Powered By Kitlog Pro v2.0

Building Integrity
' style=
Date:  4-21-2018
Number of Hours:  3.00
Manual Reference:  Section 2
Brief Description:  Lower cowl gets 2 more plies BID

The lower cowling has been sitting around while I was waiting for more BID to arrive and was tackling the exhaust layout. Well, the BID arrived so I fully prepped the lower cowling and added 2 final plies of BID, then installed it onto the airframe and clamped it into postition for cure. She will stay here until Monday to ensure she cures in the right position and shape.
' style=

Lower cowling prepped

Lower cowling prepped

' style=

2 plies BID wet out

2 plies BID wet out

' style=

Clamped into position for cure

Clamped into position for cure

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.