Date:  5-20-2014
Number of Hours:  3.00
Manual Reference:  ch 24
Brief Description:  2 Plies BID over foam

The overnight cure of the hell hole cover foam was solid. I trimmed it up and installed it with dry micro. I then added 4 more blocks of foam at the 4 corners that were exposed and slurried it all. I then added 2 plies BID all over per plans lapping 2" onto the fuse all around. I made sure not to glass onto the landing gear legs as there must be room for movement during harder landings. After this cures there will be transition fairings added for cosmetic appeal.
' style=

foam on and slurried up

foam on and slurried up

' style=

2 plies BID