KitLog pro

Powered By Kitlog Pro v2.0

Building Integrity
< Previous Log Entry          Next Log Entry >
' style=
Date:  1-29-2018
Number of Hours:  1.50
Manual Reference:  ch 21
Brief Description:  Fuel sump blisters get X-30

Making sure to prep the new resin and glass work for fuel, I post cured them a bit using a heater. I was able to get the sump surfaces to a safe 108 deg. for about 3hrs each. This goes a long way in completeing the cross linking of the epoxy, henceforth, fuel resistance. After they cooled down, I made duct tape dams and filled the aft section with X-30 foam. Contoured down, and slurried, they got 2 plies BID and peel ply. Next up is bringing them back to a pleasant micro contour. this lower fuselage is about to look like a winter wonderland. :)
' style=

X-30 in place

X-30 in place

' style=

2 plies BID

2 plies BID

' style=
< Previous Log Entry          Next Log Entry >










Copyright © 2001-2024 Matronics. All Rights Reserved.