KitLog pro

Powered By Kitlog Pro v2.0

Building Integrity
' style=
Date:  1-18-2018
Number of Hours:  0.50
Manual Reference:  ch 25
Brief Description:  Nose Guide coat #1

The last layer of flocro was sanded down and contoured then 1 coat of grey primer was laid down. Looks like the contouring was good so the final steps should be few :)
' style=

ready for guide coats

ready for guide coats

' style=

1 coat primer on

1 coat primer on

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.