KitLog pro

Powered By Kitlog Pro v2.0

Building Integrity
' style=
Date:  3-30-2016
Number of Hours:  4.00
Manual Reference:  ch 10
Brief Description:  Let's have another :)

The flox and glass had cured well overnight so I trimmed it up and installed the new left canard tip and flushed it with the contour of the canard. Boy, i love the way it looks with the elevators on too. I'm even wondering if there will be a way to build a radiused edge where the two meet or if it will even make a difference. sure would look rad though :)
The second tip went on without issues but i did notice a very noticeable difference in the shape of the canard contour from one to another. I really think this means more micro on the canard to make them equal rather than having mismatched tips to hide the canard contour issue. Gotta have it right! I also spent a good 20 minutes making sure both tips were installed with the same incidence angles.
After cure Ill give the canard a good micro treatment and start honing in on that contour.
' style=

Left tip  ready for glass and finishing work

Left tip ready for glass and finishing work

' style=

Looks awesome with elevators on

Looks awesome with elevators on

' style=

identical tip for right side

identical tip for right side

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.