KitLog pro

Powered By Kitlog Pro v2.0

Building Integrity
' style=
Date:  12-10-2017
Number of Hours:  3.00
Manual Reference:  ch 24
Brief Description:  New air vent location continues...

The pilot air vent re-location is going extremely well. The old location is repaired and filled and even painted inside. The micro on the exterior is all spread out. The Naca has also been bonded in a bed of flox and micro and is now ready to sand and paint. The exterior will be getting filler and primer as soon as she gets flipped upside down here soon. I also found that I can run the OAT probe to the air vent in its new location and will only need to extened the ground wire. Luck is with me :)
' style=

Glass cured and trimmed

Glass cured and trimmed

' style=

Micro fill

Micro fill

' style=

Micro and Z-grip fill

Micro and Z-grip fill

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.