KitLog pro

Powered By Kitlog Pro v2.0

Building Integrity
< Previous Log Entry          Next Log Entry >
' style=
Date:  8-9-2012
Number of Hours:  1.50
Manual Reference:  ch 00
Brief Description:  The next step

Working on a project that is somewhat complete doesn't offer the ability to go through the plans 1 page at a time but rather calls for some skipping around. Tonight was spent going back over the plans and "A&D's" to sum up the work I've done so far and see what the next big step will be. I'm at the point where I will soon need to install the spar which will occupy a lot of space as well as me it more difficult to turn the fuselage on it's back so easily so I'm trying to wait as long as possible. Oregon Aero is working on my seats which will lead to the final installation of my controls which lead to the spar..and on and on... So for now I'm considering fuel systems and main landing gear. more to come...
' style=





' style=
< Previous Log Entry          Next Log Entry >










Copyright © 2001-2024 Matronics. All Rights Reserved.