KitLog pro

Powered By Kitlog Pro v2.0

Building Integrity
' style=
Date:  5-19-2014
Number of Hours:  3.00
Manual Reference:  ch 21
Brief Description:  Spar closeout and sump airfoils

What an Awesome day. It's rare that I'm able to accomplish so much in one day. I was really stoked to install the wing bolts permanently. Well 4 of them at least. The inboard bolts may get the same C Channel install as well. It will depend on how many times I think I'll be removing the main wings.... Jury's out. I then laid up 2 plies of Bid stretched with tape for a level layup.
I then made up a couple duct tape dams and poured X-30 over the aft portion of the sumps where air will most definitely separate if not airfoiled. This foam was easily shaped into a much better airfoil that will continue into the cowling. After shaping I laid up 1 ply of BID over both and peel plied.
' style=

Wing Bolts are installed for good!

Wing Bolts are installed for good!

' style=

2 Plies Bid stretched over opening

2 Plies Bid stretched over opening

' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.