KitLog pro

Powered By Kitlog Pro v2.0

Building Integrity
' style=
Date:  10-21-2013
Number of Hours:  5.00
Manual Reference:  ch 21
Brief Description:  BID on Baffles

Crazy how long it takes to layup several small pieces of Glass. Every corner must be covered, every joint be wetted out and when all was said and done the entire fuel tank was skim coated as well. This is Skim coat #2 of 3. I also sanded and prepped the other strake for this procedure as well.
' style=

Bid in every corner and every joint.

Bid in every corner and every joint.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.