KitLog pro

Powered By Kitlog Pro v2.0

Building Integrity
' style=
Date:  10-14-2019
Number of Hours:  5.00
Manual Reference:  Section 2
Brief Description:  Almost ready to run

5 more hours today to install the pushrods, tappets, and get them all gapped to .006". I then installed all new silicone couplers and clamps on the down tubes and re-installed the intake manifold. plugs, wires, and zip ties, then draining the sump. Friday the sun comes out, fresh Brad Penn breakin oil goes in, and it's time to light the fires.
' style=

.006

.006" tappet adjustment

' style=

Intake manifold is in

Intake manifold is in

' style=

oil drained

oil drained

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.