KitLog pro

Powered By Kitlog Pro v2.0

Building Integrity
' style=
Date:  5-11-2018
Number of Hours:  1.00
Manual Reference:  ch 10
Brief Description:  Canard is re-installed and delam repairs are made

It's really nice seeing the canard back on the airframe again, though it won't compare to the all new Roncz that will be getting built here soon. The left elevator had some areas of concern as I was able to find a line of delams that I know were related to the skin being thin in that area. I drilled several holes and injected wet micro to save weight and then Z-Gripped over them and contoured it out. I won't be trying to re-paint them, I just need them airworthy until the new canard is built.
' style=

Canard is on

Canard is on

' style=

Delams injected

Delams injected

' style=

Z-grip filled and contoured.

Z-grip filled and contoured.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.