Brief Description: Lower cowl gets 2 more plies BID
The lower cowling has been sitting around while I was waiting for more BID to arrive and was tackling the exhaust layout. Well, the BID arrived so I fully prepped the lower cowling and added 2 final plies of BID, then installed it onto the airframe and clamped it into postition for cure. She will stay here until Monday to ensure she cures in the right position and shape.