KitLog pro

Powered By Kitlog Pro v2.0

Building Integrity
' style=
Date:  3-12-2018
Number of Hours:  2.50
Manual Reference:  ch 25
Brief Description:  wet sanding the first coat

Heating the shop to 80 degrees really paid off as I was easily able to wet sand the first coat today in prep for successive coats. I didn't have it in me to spend time down on the floor sanding wheel pants however so no credit there :)
' style=

180 grit wet sanded

180 grit wet sanded

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.