KitLog pro

Powered By Kitlog Pro v2.0

Building Integrity
' style=
Date:  12-13-2017
Number of Hours:  2.00
Manual Reference:  ch 25
Brief Description:  Both Cowls get filler

The lower cowling needed more Filler to match the contour of the left side of the scoop but is getting very close to final primer. Take a look at the nose. Filler primer filled the scratches and final low spots, was wet sanded with a sanding sponge and is now ready for final primer. This will come later on after the bottom is primed white and ready for paint.
After trimming the upper cowling for a nice leading edge transition, I piled on the micro. The micro will determine the thickness of the cowling and then will be taped off and the turtle deck and scoop will get micro to match. A nice tight fit is coming soon...
' style=

Micro build up

Micro build up

' style=

Z-Grip the low spot

Z-Grip the low spot

' style=

Ready for final primer

Ready for final primer

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.