KitLog pro

Powered By Kitlog Pro v2.0

Building Integrity
' style=
Date:  12-7-2017
Number of Hours:  3.00
Manual Reference:  ch 24
Brief Description:  New air vent in place and old hole filled

The air vent was sanded and prepped then installed in the floor of the nose using a bed of flox. Later, when a 1.5" silicone coupler arrives, I'll be using it to give clearance around the opening while I bury it in dry Micro. I'll then remove the coupler and the clearance will be perfectly cleared for the flex hose and clamp. I then used a block of blue foam shaped to fit the hole left in the nose from the previous location and laid up 2 plies UNI over the outside and 1 ply BID on the inside, pre-microed and cured for less mess.
' style=

Air vent in bed of flox

Air vent in bed of flox

' style=

BID over foam plug installed

BID over foam plug installed

' style=

2 plies UNI to cover the foam plug

2 plies UNI to cover the foam plug

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.