KitLog pro

Powered By Kitlog Pro v2.0

Jims RV-8
' style=
Date:  11-20-2022
Number of Hours:  1.50
Manual Reference:  
Brief Description:  Routing the GEA 24 P244 harness wires

It took a little longer than I expected since the pathways are rather cramped at this point, so I had to tape and run them in two phases. It worked out in the end, and now I need to start the last connections. Yay!
' style=

The loose bundle of wires is headed to the aft, less the one volts wire

The loose bundle of wires is headed to the aft, less the one volts wire

' style=

Aft and mid wire groups

Aft and mid wire groups

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.