KitLog pro

Powered By Kitlog Pro v2.0

Jims RV-8
' style=
Date:  7-4-2022
Number of Hours:  3.00
Manual Reference:  
Brief Description:  Panel wiring - cleanup + Fire sleeves

With the C/B bank done, I focused on the other wires behind the panel. I moved the finished harnesses more into their positions to see where the big #10 wires that feed the C/B bank are routed with the other panel switch wires. I re-routed quite a few wires that were under, behind, over, and around some of the other wires to tidy up the wire runs before I plan to dive into the panel switches. I wanted the harnesses going up and back to be on the aft side of the trunk while moving the panel switch wires to the front so they wouldn't interfere with each other.



I also thinned some RTV with Acetone to finish the ends of my fire sleeve, as I had seen Ralph do on Bob's log.



God Bless America!
' style=

Tidy up done on the C/B bank service loop

Tidy up done on the C/B bank service loop

' style=

Harnesses moved and wires moved

Harnesses moved and wires moved

' style=

fire sleeves prepped and drying

fire sleeves prepped and drying

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.