KitLog pro

Powered By Kitlog Pro v2.0

RV-6A - GBC
< Previous Log Entry          Next Log Entry >
' style=
Date:  5-27-2006
Number of Hours:  3.00
Manual Reference:  
Brief Description:  Move QB to garage 'hanger'

Picked up the fuselage at Mesa (FFZ) this morning and transported to the 'hanger' (pun intended) for work in the airplane factory. Also, got the last of the loose material; main gear, fasteners, control rod material and skins.

Had the help of family members, wife, daughter and contractor-in-law. Not everyone was feeling the enthusiasm of the RV grin developing. Must have skipped a step in the Dan Checkoway lesson on "including the spouse." Hmmmmm - revisit the website.

Fuselage was very manageable by two men until it got a little tight getting around the rack/shelves. Then we needed additional support while we swung in the straps and cranked it up. The forward strap sits under the landing gear bracket & slightly forward of the temporary spar. The back strap is positioned under the baggage compartment bulkhead area.

The firewall could be lowered a little and raise the tail slightly to make it easier to walk under that area. The length of about 14 ft 6 in extends about 5 ft into the 2nd bay of the garage. This easily clears the wing cart even with the HS laid on top.
' style=

Daughter getting started on RV grin

Daughter getting started on RV grin

' style=

Wife and contractor-in-law not grinning

Wife and contractor-in-law not grinning

' style=
< Previous Log Entry          Next Log Entry >










Copyright © 2001-2024 Matronics. All Rights Reserved.