KitLog pro

Powered By Kitlog Pro v2.0

RV-6A - GBC
' style=
Date:  6-29-2013
Number of Hours:  4.50
Manual Reference:  
Brief Description:  Rollbar - brackets and braces

Fitting, or match fitting the replacement rollbar is taking a tremendous amount of time. Details like the sequence of drilling holes, or multiple assemble/disassemble steps are required. Alignment must be checked against existing components and holes.

If a hole is enlarged or countersunk too soon it's more difficult to align and the brackets cannot be threaded if a match-drill in assemble is required later.

Managed to only drill one hole wrong and spent an hour re-fabricating the angle bracket. Finally happy with the fit and removed it all to clean-up, prime and re-assemble. Need to cut a 1.5" hole in aft F-631A both Lt & Rt sides. Need to add nutplates for the UMH guide blocks to close canopy straight, before closing up..
' style=

Final alignment

Final alignment

' style=

Back drilled to 'mark'

Back drilled to 'mark'

' style=

Pressure applied to F-631A

Pressure applied to F-631A

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.