Powered By Kitlog Pro v2.0
RV-6A - GBC
RV-6A QB
All
12-21-2016
< Previous Log Entry
Next Log Entry >
Date:
12-21-2016
Number of Hours:
5.00
Manual Reference:
Brief Description:
Rudder - Swap bottom fairing
Finished the remaining tasks on installation of the original fairing to the new mounting strip, with nutplates to match my original bottom fairing with taillight/strobe.
Applied final primer to protect aluminum that was sanded.
New mounting strip with nutplates
Connected the light
Finished priming the area & securing
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
RV-6A QB Home
Category
# Logs
# Hours
All
1255
3573
Avionics
77
222
Controls
50
143
Electrical
133
440
Empennage
48
140
Engine
126
392
Finishing Kit
165
457
Fuel System
51
156
Fuselage
317
864
Gear
37
87
Miscellaneous
45
109
None
9
13
QuickBuild RV-6A Kit
6
5
Shop Supplies
1
1
Tools
12
20
Wings
147
455
Workshop
31
69
Copyright © 2001-2024 Matronics. All Rights Reserved.