The strips of saturated fiberglass setup in a couple of hrs, but still curing because of the lower temps.
Will next have to 'cut-off' the inside excess to leave a clean tunnel that will slip into the front of the FAB. Also have to grind out the foam block used to form the tunnel. Then cut-off the excess in the front and shape the inlet.