Powered By Kitlog Pro v2.0
RV-6A - GBC
RV-6A QB
All
12-12-2014
< Previous Log Entry
Next Log Entry >
Date:
12-12-2014
Number of Hours:
1.00
Manual Reference:
Brief Description:
SkyView - GPS wiring
Watched training videos on Dynon buttons & knobs. Connected the 'installed' wire to the aft GPS location and fired-up SV for test and training review.
Got out the Vans wheel nut wrench kit, and assembled. (the usual match drill, etc.) Nice light weight tools to carry in the plane.
Torqued a couple of the AFP nozzles (used the new adapter for the in-lb torque wrench).
Downloaded and updated the Obstacle database for the Dynon.
Wheel nut wrench
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
RV-6A QB Home
Category
# Logs
# Hours
All
1255
3573
Avionics
77
222
Controls
50
143
Electrical
133
440
Empennage
48
140
Engine
126
392
Finishing Kit
165
457
Fuel System
51
156
Fuselage
317
864
Gear
37
87
Miscellaneous
45
109
None
9
13
QuickBuild RV-6A Kit
6
5
Shop Supplies
1
1
Tools
12
20
Wings
147
455
Workshop
31
69
Copyright © 2001-2024 Matronics. All Rights Reserved.