KitLog pro

Powered By Kitlog Pro v2.0

Eddie's Zodiac XL Project
' style=
Date:  11-6-2011
Number of Hours:  18.00
Manual Reference:  
Brief Description:  Wiring

Its been a while, but I have competed and tested the FWF wiring, and all the EMS indicators are working correctly.

The Fuel Purge Valve, Throttle, Mixture and Cabin heat cables have been installed and are all working correctly.

I have also wired in the Main bus and Avionics Bus fuse blocks so that delicate electronics can be turned on after engine start. I have also installed a large capacitor across the avionics fuseblock to hopefully help filter out any noise.

The ICOM 210 radio, Intercom, GPS and transponder are now running off the avionics buss and are functioning properly, also the stereo music input is wired and working.

I am now focusing on getting the wiring run down the center of the fuselage to connect the trim functions on both sticks, connect the Strobes and lights to plugin connectors on the sides of the fuselage so that they can be easily connected to the wings. I am also working connecting the rear trim servo (wiring for this in the elevetor is complete), aileron trim servo, flap servo and rear tail strobe.....
' style=

D-Sub connecters wired to both sticks

D-Sub connecters wired to both sticks

' style=

Map box finally riveted into to place

Map box finally riveted into to place

' style=

Wiring nightmare

Wiring nightmare

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.