KitLog pro

Powered By Kitlog Pro v2.0

Eddie's Zodiac XL Project
' style=
Date:  2-20-2011
Number of Hours:  6.00
Manual Reference:  
Brief Description:  Polished canopy crack and riveted canopy sides

Today I removed the canopy and filled the crack from the inside and then polished both sides, its passable so I will continue to move forward.

I then re-installed the canopy and bolted and riveted the side skirts into place as well as installing the right side handle to lift the frame open and closed.

I have also sealed the leading edge of the canopy where it meets the skin with silastic and I'll then fill over the top of this with micro balloons before beginning the fiber glassing.
' style=

Right side canopy crack polished and sides riveted and bolted

Right side canopy crack polished and sides riveted and bolted

' style=

Left side riveted and bolted

Left side riveted and bolted

' style=

Dynon Transponder Module installed

Dynon Transponder Module installed

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.