KitLog pro

Powered By Kitlog Pro v2.0

Eddie's Zodiac XL Project
' style=
Date:  1-2-2011
Number of Hours:  5.00
Manual Reference:  
Brief Description:  Counter sinking the canopy

Kept looking at the crack in the canopy all day long while I drilled and counter sunk all the holes, everything went really well and the canopy and frame have been drilled out to #27 after the counter sinking was completed ready for the #6 counter sunk screws that will hold the canopy in place.

Still cant believe the dam crack in the right side of the screen, ahhhhhh.
' style=

First hole counter sunk

First hole counter sunk

' style=

All the right side counter sunk

All the right side counter sunk

' style=

All the left side counter sunk

All the left side counter sunk

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.