KitLog pro

Powered By Kitlog Pro v2.0

Eddie's Zodiac XL Project
' style=
Date:  1-1-2011
Number of Hours:  4.00
Manual Reference:  
Brief Description:  Drilling the canopy to the frame

Everything was going so well, 35 degrees C in the garage and I marked the frame and drilled all the holes with a #40 drill, I then re-installed the canopy and started drilling the canopy into the frame using a plexi glass drill.

I drilled the rear canopy frame top down on each side and then drilled all of the left side, I then moved to the right side, and drilled from the rear forward, as I drilled the very last hole, bang a 3 inch vertical crack appeared, I quicky stop drilled the crack to stop it spreading any further, I then poured super glue into the crack and clecoed it.

What a bummer I am going to be looking at this crack for a long time as I am not inclined to buy a new canopy....sigh.

At least its on the passenger side, but I am sure I will look at it each time I scan for traffic...
' style=

Left top to front all drilled

Left top to front all drilled

' style=

Right side top to front drilled

Right side top to front drilled

' style=

Right side drilled, major disaster, the last hole and the canopy cracked

Right side drilled, major disaster, the last hole and the canopy cracked

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.