KitLog pro

Powered By Kitlog Pro v2.0

Eddie's Zodiac XL Project
' style=
Date:  12-26-2010
Number of Hours:  6.00
Manual Reference:  
Brief Description:  Installed and riveted the canopy brace

The canopy frame is now completely riveted so I am now ready to get the canopy back out and do all the marking required before the big cut, for today though I'll let the paint dry and perhaps install the elevator pitch servo.
' style=

Left veiw of canopy brace riveted into place

Left veiw of canopy brace riveted into place

' style=

Center view of canopy brace

Center view of canopy brace

' style=

Top view of tipup canopy with flush rivets at the front and pop rivets at the rear

Top view of tipup canopy with flush rivets at the front and pop rivets at the rear

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.