|
|
Eddie's Zodiac XL Project
|
Date: 6-17-2010
|
Number of Hours: 3.00
|
Manual Reference:
|
Brief Description: Tunnel nut plates and re-install flap assembly
|
|
The center tunnel nut plates took me 1.5 hours to install because of the awkard position, standing on a stool bent at the waist 90 degrees, wow, very painful, that will teach me to forget a step.
With the nut plates done, I started by lock wiring the servo motor per the instructions, then the re-assembly began, its pretty strait forward, but it still to 1.5 hours to get it done, the nut plates leave very little room for error !!!
My next step is to install the wings, I am not sure if I'll try and get the engien mount and wheels on to make moving the fuselage a little easier...
|
|
Center tunnel nut plates installed
|
|
Flap housing and seats
|
|
Side view with screws temporarily in place
|
|
|
|
|
|
|
|
|
Copyright © 2001-2024 Matronics. All Rights Reserved. |