KitLog pro

Powered By Kitlog Pro v2.0

Eddie's Zodiac XL Project
' style=
Date:  11-24-2009
Number of Hours:  4.00
Manual Reference:  
Brief Description:  Installed forward bottom floor and rudder pedals

Last Sunday Dusan came over for a visit and to lend a hand, we started with installing the forward bottom floor and its associated stiffeners, two people made this job easy as you need to allign the center line drawn on the stiffeners through the holes in the skin, before back drilling and installing clecos.

With this done I checked that the fuel injection pump tray would fit between the center stiffeners, it does with no modifications requried except that the forward heat diffuser needed to be chopped down in size.

With this done we moved onto the manufacture of the rudder pedals and their associated angles, 2 hours later and we were done. Now I just need to install the brake cylinders and drill the mounting holes for the various adjustment positions for the pedals themselves.
' style=

Left view, floor, with stiffeners and rudder pedal assembly

Left view, floor, with stiffeners and rudder pedal assembly

' style=

Forward view, floor, with stiffeners and rudder pedal assembly

Forward view, floor, with stiffeners and rudder pedal assembly

' style=

Right view, floor, with stiffeners and rudder pedal assembly

Right view, floor, with stiffeners and rudder pedal assembly

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.