KitLog pro

Powered By Kitlog Pro v2.0

Eddie's Zodiac XL Project
' style=
Date:  6-21-2009
Number of Hours:  5.00
Manual Reference:  
Brief Description:  Flap assembled, back drilled, deburred and etch pr

Ian came over on Wednesday night and gave me a hand to assemble and back drilled the flap, it took us 2 horus to get the whole lot done.

One Friday night I back drilled deburred and dimpled the parts and cleaned them up for etch priming.

This morning I etch primed the skins, and ribs and while this was drying I counter sunk the bottom of the flap spar where the hinge will attach before then etch priming it.

Given that its quite damp here and the temps are low, I will now leave all of this for a good day before commencing the assembly and riviting.
' style=

Bottom flap skin and ribs, back drilled, deburred, dimpled and etch primed

Bottom flap skin and ribs, back drilled, deburred, dimpled and etch primed

' style=

Flap spar back drilled,  deburred, dimpled, counter sunk and etch primed

Flap spar back drilled, deburred, dimpled, counter sunk and etch primed

' style=

Top flap skin back drilled, deburred, dimpled and etch primed

Top flap skin back drilled, deburred, dimpled and etch primed

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.