KitLog pro

Powered By Kitlog Pro v2.0

Eddie's Zodiac XL Project
' style=
Date:  3-30-2009
Number of Hours:  2.00
Manual Reference:  
Brief Description:  Fuel tank stiffeners, drain and filler

Last night I started work on the right tank, Ian came over and gave me a hand to hold everything in place, insert rivets etc. once this was done I back riveted the stiffeners, 15 minutes and it was all done. The fuel drain was then riveted into place before a quick clean up, and then moving onto the filler neck on the top side of the tank. With this complete I gave the tops of the rivets a coat of proseal to make sure there are no leaks and then we tidied up the tools before the proseal started to set.
' style=

Filler cap neck riveted adn prosealed

Filler cap neck riveted adn prosealed

' style=

Tank stiffeners prosealed and riveted into place

Tank stiffeners prosealed and riveted into place

' style=

Fuel drain riveted and prosealed

Fuel drain riveted and prosealed

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.