Powered By Kitlog Pro v2.0
Eddie's Zodiac XL Project
RV-7
All
2-8-2009
< Previous Log Entry
Next Log Entry >
Date:
2-8-2009
Number of Hours:
8.00
Manual Reference:
Brief Description:
Tie down bracket
After the initial wing prep I started on nthe tie down bracket and spacers, once it was all back drilled, it was bolted in place and the aileron control horn attached and nuts torked to the correct value.
Tie down bracket back drilled and etch primed
spacers back drilled adn etch primed
Aileron bracket bolted in place
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-7 Home
Category
# Logs
# Hours
All
470
2573
Ailerons
9
38
Avionics
12
110
Brakes
5
14
Canopy
33
141
Center Fuselage
26
116
Centre spar
3
37
Cowling
20
109
Empennage
65
231
Engine
24
114
Fairing
24
87
Final Assembly
6
39
Firewall
14
66
Flap assembly
6
30
Flight testing
2
25
Front Fuselage
5
115
Fuselage
34
176
FWF
2
16
Instrument panel
9
50
Miscellaneous
10
142
None
4
13
Painting
25
219
Prop
3
7
Rear turtle deck
6
38
Roll Bar
1
16
Rudder
3
3
Seats
2
8
Spinner
3
4
Vertical Stab
5
14
Wheels and brakes
1
41
Wings
108
554
Zodiac 601 XL Home
Copyright © 2001-2024 Matronics. All Rights Reserved.