KitLog pro

Powered By Kitlog Pro v2.0

Eddie's Zodiac XL Project
' style=
Date:  1-15-2009
Number of Hours:  2.00
Manual Reference:  
Brief Description:  Left flap

All the prep work is now done, so I can disassemble, deburr,dimple and etch prime before reviting the flap together.
' style=

Left control bracket back drilled into place and the leading edge bent the requried 6.3 degrees

Left control bracket back drilled into place and the leading edge bent the requried 6.3 degrees

' style=

Support bracket manufactured and back drilled to the spar

Support bracket manufactured and back drilled to the spar

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.