This afternoon I started on the construction of the right elevator by cutting all the stiffeners for both the right and left elevator. All the parts where then labelled A-G and G-L for the respective sides. The parts where then edge finished using the 3M wheel and then installed into the elevator skin so that they could be back drilled. Once hits was done all the parts where removed, deburred and dimpled.
All the stiffeners, cut, edge finished, drilled and dimpled
Right skin with stiffeners installed ready to be back drilled