KitLog pro

Powered By Kitlog Pro v2.0

Eddie's Zodiac XL Project
' style=
Date:  9-17-2011
Number of Hours:  6.00
Manual Reference:  
Brief Description:  Install snorkle and baffles

After being inspired by my trip to Narromine for the SAAA national convention and also having a fly in a RV6 and also having the chance to see what its like to do aerobatics in an RV (just bloody fantastic), I got stuck into finishing the snorkle and baffle re-installation.

The installation went well and I can now tidy up the rest of the wiring (top spark plugs and the EGT/CHT probes) around the engine and move onto the instrument panel wiring.
' style=

Snorkle fibre glassed and isntalled

Snorkle fibre glassed and isntalled

' style=

Air filter surround

Air filter surround

' style=

Baffles installed

Baffles installed

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.