Kept looking at the crack in the canopy all day long while I drilled and counter sunk all the holes, everything went really well and the canopy and frame have been drilled out to #27 after the counter sinking was completed ready for the #6 counter sunk screws that will hold the canopy in place.
Still cant believe the dam crack in the right side of the screen, ahhhhhh.