KitLog pro

Powered By Kitlog Pro v2.0

Eddie's Zodiac XL Project
' style=
Date:  11-22-2010
Number of Hours:  3.00
Manual Reference:  
Brief Description:  Install Shunt and cable glands

Back into the building after being overseas in Bulgeria for a few weeks.

I installed and connected the amps shunt between the output of the Master solinoild and Starter solinoid.

Also connected the cable that will terminate the +ve volts for the Master distribution block, this feed is taken on the output of the shunt.

Checked that the Master relay works by grounding the center post, the one with the yellow heat shrunk diode connect to it.
' style=

Battery cables terminated and connected

Battery cables terminated and connected

' style=

COnnection between master soliniod and Shunt installed

COnnection between master soliniod and Shunt installed

' style=

Cable gland installed and EMS wiring harness poked through

Cable gland installed and EMS wiring harness poked through

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.