Brief Description: Back drilled rear turtle deck to longeron
With the baggage floor complete it was time to move back to the rear turtle deck, I re-installed the rear top skin with clecos and then marked out the 40mm rivet pitch on both sides of the turtle deck skin. I then drilled all the holes first with a #40 bit followed by the #30. Its looking pretty good so far. Tomorrow night I'll install the front top skin and the two front hoops and then finish drilling the front hoop to the front skin.
Right view, the sides of the rear turtle deck back drilled to the top longeron
Left view, the sides of the rear turtle deck back drilled to the top longeron