KitLog pro

Powered By Kitlog Pro v2.0

Eddie's Zodiac XL Project
' style=
Date:  5-12-2007
Number of Hours:  0.00
Manual Reference:  
Brief Description:  Checking wing installation.

With the wing measurements done, both wings where removed and the cables made for the left and right ailerons and the centre balance. I also drilled all the holes for the fuel lines and pitot and atatic lines. The cables have all been installed and swaged, and strings left in the wings so that they can be pulled through. Next weekend the wings are going on again so that I can make the fiberglass fairings... should be nice and messy as I am going to start with a layer of plaster, hopefully I can smooth it to shape and sand it flat and then lay the glass over this.
' style=

Both wings on

Both wings on

' style=

Bad close up trying to sight down the wing

Bad close up trying to sight down the wing

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.