Brief Description: Last 4 Plys tortional gear layups
With everything ready and the gear turned over and secured the last 4 plys of the 8 ply layup were completed. It still took a good 6.5 hours and again the room was preheated to 26-27C.
I peel plyed at the end as I'm planning on a fairing and there is still the relief tube and brake line layup to go at the edges.
Overall it worked out well. I had a lot of trouble getting my head around this whole layup but was determined to have a good procedure as its not something I'd enjoy doing twice.