Brief Description: Fuel System Getting those ducks in a row 3
Time to start securing the pumps to the sump wall area. The on/off vlave is connected to the pumps now so its just those that need securing.
I placed the bottom click bonds and with plenty of release tape made sure they were in the right place by using a stick to foce the pumps right up against the sump wall while the epoxy set. Pic 1.
This worked really well. After cure I did the clean up and then some BID disks carefully over the click bonds and the result you see in pic 3.