KitLog pro

Powered By Kitlog Pro v2.0

Zenith CruZer & Sonex Logs
' style=
Date:  3-15-2018
Number of Hours:  3.40
Manual Reference:  C75-WA-1
Brief Description:  First wing work

A lot of work today, but great progress to show for it. 11 nose ribs and 9 rear ribs.

1. First, had to up-drill all flange holes to #20 in the nose and rear ribs.

1a. Deburred spar.. Starting with the right wing.

2. Positioned the flaperon hinge brackets onto 4 of the rear ribs, and up-drilled to #20 on each.

3. Cut lengths of L-angle, positioned next to flaperon attach bracket mounting location on the rear ribs, clamp in place, and drill thru the rib into the L-angle. These will stiffen the brackets and tie to the wing skins.

4. Deburred all ribs, brackets, L-angles, etc.

5. Cleco'd ribs into position on the spar. The open area in pic 3 below is where the fuel tank will go. Had to cut a notch in one rib near the spar attach fitting.
' style=

up-drilling flange holes

up-drilling flange holes

' style=

fab'd flaperon bracket support

fab'd flaperon bracket support

' style=

Skeleton cleco'd into position; ready for rivet

Skeleton cleco'd into position; ready for rivet

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.