KitLog pro

Powered By Kitlog Pro v2.0

Zenith CruZer & Sonex Logs
' style=
Date:  1-6-2018
Number of Hours:  0.40
Manual Reference:  C75-TA-1
Brief Description:  Close top of Horiz Stab

Set up the cleco's. Gently folded the top of the horizontal stabilizer over using a 1x2, 6' long to avoid kinking the skin.

Pulled the skin into place, and cleco'd into position. Measured stabilizer mid-point and marked. Measured elevator hinge mid-point and marked that. Will need to insert hinge between skin and aft spar, then updrill to #30, then updrill again to #20.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.