KitLog pro

Powered By Kitlog Pro v2.0

Zenith CruZer & Sonex Logs
' style=
Date:  12-12-2018
Number of Hours:  1.20
Manual Reference:  C75-FA-4
Brief Description:  Baggage Compartment wrap-up for now

Didja miss me? Was out of state for a week to participate in some Christmas festivities, then took a few days on our return to get our own tree, put the lights up, shop a bit, etc., and generally recover from our absence.

Tonight I basically finished the baggage compartment area with the exception of the control tunnel.

Finished riveting the flaperon mixer brackets and F3-1 channel to the fuselage sides. Riveted the upper baggage floor to the baggage back wall and fuselage sides.

Installed the flaperon control rods; can't complete this until the wings are installed, so I safety-wired teh upper ends to the top of the fuselage.

Cleco'd the remaining baggage compartment items. This included the control rod covers, lower baggage floor, and lower baggage uprights. These can only be cleco'd now because access underneath will be required upon final assembly.
' style=

close up of linkage

close up of linkage

' style=

riveted upper baggage floor

riveted upper baggage floor

' style=

lower floor uprights and floor pans

lower floor uprights and floor pans

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.