KitLog pro

Powered By Kitlog Pro v2.0

Zenith CruZer & Sonex Logs
' style=
Date:  11-21-2018
Number of Hours:  1.70
Manual Reference:  C75-FA-3
Brief Description:  Finish L-angles for baggage floor

No pics.

Finished cleco-ing the baggage uprights and flaperon control rod covers. Had to cleco-in-place the lower baggage floor and baggage uprights to get the correct spacing.

Had to fabricated L-angles for the right side assemblies.

Once everythingwas in place, I used a 12" bit and pilot-drilled thru the floor holes into the two L-angles fabricated on Monday. Upsided to #30 for A4 rivets.

Dissassembled all. Deburred. Riveted the L-angles (4) to the baggage floor or flaperon control cover as appropriate.

Up-drillled the torque tube channel gussets and cleco'd in place.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.