KitLog pro

Powered By Kitlog Pro v2.0

Zenith CruZer & Sonex Logs
' style=
Date:  7-2-2018
Number of Hours:  1.00
Manual Reference:  C75-WA-2
Brief Description:  Un-Cleco upper skins; begin debur

No pics.

Cleaned up the drill shavings from up-drilling the main spar.

Removed Cleco's from all upper skin surfaces.

Began debur; deburred both sides of nose skins. Deburred upper surface of main spar.

Evaluated pitot tube aluminum assy to determine how close to the main spar the tubing will run when pushed up inside.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.