KitLog pro

Powered By Kitlog Pro v2.0

Zenith CruZer & Sonex Logs
' style=
Date:  8-21-2020
Number of Hours:  1.40
Manual Reference:  C75-MBO-1A
Brief Description:  Finish map box installation

I had previously cut the panel for the map box and drilled/cleco'd the box to the rear of the panel. Today I had to mount the door with hinge. This was hard as there was no way to get a clamp in position to hold things in alignment, so had to obtain a second set of hands to hold things using the human clamp. First installed the hinge by aligning with the front edge of the map box (the easy part). Then had to hold the door in place, in alignment, to drill the door to the hinge. Cleco'd, updrilled, deburred, and riveted the hinge to the box and the door to the hinge. I then re-cleco'd the box into position and up-drilled all of the end and side rivet holes holding the box together. Removed the parts and deburred. Re-assembled, cleco'd onto the panel, and riveted all except the rivets holding the box to the panel. Really don't want to rivet yet just to allow room to work, but by the same token, I need to rivet the box in place before I can paint the panel prior to parts installation.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.