KitLog pro

Powered By Kitlog Pro v2.0

Zenith CruZer & Sonex Logs
' style=
Date:  11-13-2022
Number of Hours:  1.50
Manual Reference:  n/a
Brief Description:  Paint upper surface of right wing

I cleaned and primed the upper wing surface the other day. Today, it warmed up juuuuust enough that I decided to try painting it. Interlux says it needs to be 50 or above; it was 52 when I started painting, and it was 53 when I finisihed.

Now I'll let it dry / cure for a week or so. The next possible painting weather shouild be on the 24th, 10-11 days away. I'll probably prep the left wing to clean and prime it in the meantime.
' style=





' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.