Continued baffke work today. Installed right side inter-cylinder baffles; went a lot quicket today. Next moved on to the small baffles that go between the cylinders right at the edge of the side baffles. There's a large hole there on each side, so this helps. Finally, installed the bracket/brace that mounts on the crankcase centerline and rivets to the aft baffles. Not shown in the pcs, but there's still a bit of rattle in there; may have to figure something out to quiet it down.
Still have to drill and rivet the aft edges of the side baffles to the main aft baffle.