KitLog pro

Powered By Kitlog Pro v2.0

Zenith CruZer & Sonex Logs
' style=
Date:  10-16-2020
Number of Hours:  4.80
Manual Reference:  n/a
Brief Description:  Start of wiring cleanup

Started grouping wires into cable bundles. A lot of disconnecting from breakers and/or grounding block to get a wire in a straighter orientation or eliminate possible tangles.

Discovered I had forgotten to tie the trim and flaps breakers to the main buss bar.

Discovered I wired the 10ga main buss feed incorrectly; ran it from the master solenoid direction to the buss bar. Duh...how about going thru the main 30A breaker? Rewired that partially; need some 6-32 yellow ring terminals to connect to the breaker tabs.

Discoverd I had not yet run wires for the alternator field from the breaker to the firewall. Made up the cables and installed.

Last night, I thought about an oops I did. I designed the panel avionic stack to be removable; i.e., to remove the screws and it would drop down behind the panel. Well, I remembered that I ran two power leads UNDER the atack, so I removed them and repositioned above the stack so there was no interference.

A lot of cutting zip ties (knew this going in) to re-bundle with new wires.
' style=

Left side

Left side

' style=

Right side

Right side

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.